How to run samples and a first order with a solar panel factory
A practical guide for brands and distributors on sampling, testing, first orders, payment and quality control when sourcing flexible or foldable solar panels.

Most problems with a new solar panel supplier can be caught before mass production, if samples are tested properly and expectations are written down. Here is the process we recommend, and the one we follow with our own partners.
1. Be specific in your first inquiry
The more a factory knows, the better the quote. Include:
- Product type and target wattage
- Where and how it will be used (RV roof, power station, balcony)
- Your market and any certifications it needs
- First order quantity and expected annual volume
- Branding and packaging needs
- Target timeline
2. Order samples of the right models
Order the models you actually intend to sell, not just the cheapest. Standard samples should arrive within one to two weeks. Custom sizes take longer.
Ask for an EL image of each sample. It shows micro-cracks that are invisible to the eye.
3. Test samples like your customers will use them
- Measure output in real sun, compared with a known reference if possible
- Fold, flex or mount them as customers would
- Check connectors with the devices your customers own
- For waterproof products, check seams and the junction box
4. Agree specifications and limits in writing
Before production, agree a written specification: cell type, front film, encapsulant, dimensions, outputs, connectors, packaging, and how the product should and shouldn’t be used. Agree warranty terms at the same time. This avoids most later disputes.
5. Place a first order
Start with a modest first order to check quality and logistics end to end. A common payment structure is a deposit before production and the balance before shipment.
6. Inspect before shipment
Ask for QC reports and photos before the balance is paid, or arrange a third-party inspection. Check samples from the production run against the approved sample.
7. Plan the long term
Share forecasts so the factory can plan materials, and review returns data together. A good supplier will want to know how products perform in the field.
How it works with us
- Samples in 7–10 days (10–15 days for custom sizes), with EL images on request
- MOQ 50 pcs per model
- Application limits and warranty terms agreed in writing before production
- T/T payment: 30% deposit, 70% before shipment
- Mass production 25–35 days after sample approval, with QC reports from your account manager